|
Buffalo Hydraulic was awarded a contract to design and build a jacking system that would provide 21 jacking points and be capable of lifting and documenting the weight of the RSS. The load was estimated to be between 5,000,000 & 8,000,000 lbs.
View our NASA project.
|